
Cross-River Bridge Construction
Heavy-duty shoring towers and working platforms for 200m span bridge deck construction.
Supported 400-ton concrete pour with zero deflection issues.

Heavy-duty shoring towers and working platforms for 200m span bridge deck construction.
Supported 400-ton concrete pour with zero deflection issues.

Full facade access scaffolding for reactor vessel maintenance and new unit construction.
15,000 m² access system assembled in 3 weeks.

Circular ringlock system for arena roof structure access and facade refurbishment.
Complex curved geometry solved with multi-directional rosette connections.

Facade access scaffolding for 42-storey building exterior cladding installation.
Wind-resistant design certified for Category C wind zones.

Internal access and shoring for large-span concrete slab pours.
Supported 500mm thick transfer slab across 12m spans.

Underground excavation support and platform-level formwork shoring.
Modular system allowed rapid reconfiguration between station sections.
Our engineering team can design a scaffolding solution tailored to your project requirements.